Gym Refurbishment Works – Four Dwellings Primary Academy
Gym Refurbishment Works – Four Dwellings Primary Academy
A busy school gym needs to be practical, hard-wearing and easy to maintain. For this school gym refurbishment in Birmingham, Integrity FM was brought in to transform the existing walls through careful preparation, high-level decoration and hygienic cladding installation.
Our team arrived on site with all the necessary plant, tools and specialist access equipment required to complete the work safely and efficiently. Our team transported a MEWP and set it up within the gym, providing safe access to the high-level panelling.
Good preparation makes all the difference to the finished result, so the first stage focused on getting the existing surfaces into the best possible condition. Redundant screws, staples, adhesive putty and other unwanted fixings were removed before any remaining holes and imperfections were filled. Sections of loose panelling were securely fixed back into position, and the surfaces were thoroughly sanded to create a smooth and stable base for the new decorative finish.
Once the preparation was complete, a suitable primer was applied to the high-level panelling and allowed to dry thoroughly. This was followed by two coats of white paint, with the correct drying time allowed between applications. The new finish immediately helped to brighten the gym, giving the upper walls a clean, modern and refreshed appearance.
Attention then turned to the installation of the hygienic wall cladding. A dedicated workstation was established, allowing the sheets and trims to be prepared accurately while keeping the surrounding work area organised and safe. Starter trims and corner beads were installed first to create neat edges and a professional finish around corners and junctions. Adhesive was then applied to the hygienic cladding sheets before each sheet was carefully positioned and fitted to the wall. A pressure roller was used across the surface to promote full adhesion, remove trapped air and ensure an even, secure bond.
After the cladding had been installed, the protective film was removed and disposed of, revealing the clean finished surface beneath. The hygienic cladding provides a smooth, durable and easy-to-maintain finish that is well suited to the everyday demands of a busy school environment.
This Birmingham school gym refurbishment has created a cleaner, brighter space. By combining careful surface preparation with fresh decoration and robust hygienic cladding, the refurbishment has given the school gym a practical, professional finish designed to stand up to regular use.
You can find out more about our recent projects and the work we carry out here.