Gym Refurbishment Works – Four Dwellings Primary Academy

Gym Refurbishment Works – Four Dwellings Primary Academy

A busy school gym needs to be practical, hard-wearing and easy to maintain. For this school gym refurbishment in Birmingham, Integrity FM was brought in to transform the existing walls through careful preparation, high-level decoration and hygienic cladding installation.

Our team arrived on site with all the necessary plant, tools and specialist access equipment required to complete the work safely and efficiently. Our team transported a MEWP and set it up within the gym, providing safe access to the high-level panelling.

Good preparation makes all the difference to the finished result, so the first stage focused on getting the existing surfaces into the best possible condition. Redundant screws, staples, adhesive putty and other unwanted fixings were removed before any remaining holes and imperfections were filled. Sections of loose panelling were securely fixed back into position, and the surfaces were thoroughly sanded to create a smooth and stable base for the new decorative finish.

Once the preparation was complete, a suitable primer was applied to the high-level panelling and allowed to dry thoroughly. This was followed by two coats of white paint, with the correct drying time allowed between applications. The new finish immediately helped to brighten the gym, giving the upper walls a clean, modern and refreshed appearance.

Attention then turned to the installation of the hygienic wall cladding. A dedicated workstation was established, allowing the sheets and trims to be prepared accurately while keeping the surrounding work area organised and safe. Starter trims and corner beads were installed first to create neat edges and a professional finish around corners and junctions. Adhesive was then applied to the hygienic cladding sheets before each sheet was carefully positioned and fitted to the wall. A pressure roller was used across the surface to promote full adhesion, remove trapped air and ensure an even, secure bond.

After the cladding had been installed, the protective film was removed and disposed of, revealing the clean finished surface beneath. The hygienic cladding provides a smooth, durable and easy-to-maintain finish that is well suited to the everyday demands of a busy school environment.

This Birmingham school gym refurbishment has created a cleaner, brighter space. By combining careful surface preparation with fresh decoration and robust hygienic cladding, the refurbishment has given the school gym a practical, professional finish designed to stand up to regular use.

You can find out more about our recent projects and the work we carry out here.

Unit Clearance – Osyth, Northampton

Project Overview

This project involved the large-scale removal and clearance of materials, equipment, and redundant stock from a redundant warehouse facility.

Our objective on behalf of the client, was to clear the site while maintaining operational safety standards, minimizing disruption, and ensuring all waste streams were managed responsibly safely and efficiently.

Given our tight deadline, a project schedule was developed to coordinate labour, vehicles, lifting equipment, and waste disposal requirements.

Prior to commencement, a full site assessment was completed to identify:

  • Access and egress routes
  • Manual handling risks
  • Weight and load considerations
  • Hazardous materials or restricted areas
  • Traffic management requirements within the warehouse

Our work included:

  • Removal of obsolete stock and palletised materials
  • Clearance of damaged and non-operational equipment
  • Segregation of recyclable and general waste materials
  • Loading and transportation of waste
  • Final sweep and clean-down of designated warehouse and office areas

Taking care of the environment:

Materials removed from the warehouse were separated where possible to maximise recycling and reduce landfill disposal.

Recyclable metals, wood, cardboard, and plastics were processed through approved waste management facilities.

Project Outcome

The warehouse clearance was completed successfully within the agreed timeframe.

The site was left clean, safe, and ready for its next operational phase.

The project demonstrated effective coordination, safe working practices, and efficient waste management throughout all stages of the removal works.

Through proper planning, experienced personnel, and adherence to health and safety standards, the works were completed with minimal disruption and a high standard of service delivery

 

Paint Spraying of Waste Bins, Cigarette Bins, Wayfinders & Lampposts – McArthur Glen

Paint Spraying of Waste Bins, Cigarette Bins, Wayfinders & Lampposts – McArthur Glen

Our team recently completed an extensive programme of paint spraying at McArthur Glen in Cannock, breathing new life into a wide range of external fixtures across the site.

The project involved the rejuvenation of waste bins, cigarette bins, wayfinding signs and lampposts, all of which had become weathered over time. Each item was carefully restored to achieve a high-quality and durable finish.

How We Delivered the Project

We attended site out of hours and created a safe working area. Dust sheets and masking were applied to safeguard surrounding surfaces, glass and stainless-steel details, preventing any overspray. The surfaces of each item were sanded back to remove previous coatings and imperfections. Certain items were removed for off-site spraying to ensure a controlled application.

Where required, primer was applied before using a professional two-pack paint system, providing a long-lasting, weather-resistant finish. Once cured, protective coverings were removed, items reinstated, and the working areas left clean and tidy before handover.

The Result

The outcome was a uniform, refreshed appearance across the site, significantly enhancing the overall presentation. Disruption to visitors was avoided while ensuring a seamless transformation.

This project highlights how our specialist spraying services can quickly revitalise and extend the lifespan of external fixtures, maintaining a professional and welcoming environment.

You can find out more about our recent projects and the work we carry out here.

Armco Redecoration – Cadent Gas, Erdington

Armco Redecoration – Cadent Gas, Erdington

IFM were tasked with Rejuvenating and Repainting Armco Barriers at Cadent Gas Birmingham.

The barriers were looking tired and aged and in need of a major uplift. Re-painting these has helped improve Health and Safety protection for site users, as well as offering future protection against the elements and therefore saving the client money long term.

This overhaul involved several steps to restore their structural integrity, aesthetic appeal, and corrosion protection.

  1. Corrosion Protection
  • Prevents Rust: Steel barriers are prone to corrosion, especially in wet or coastal environments. A fresh coat of paint acts as a protective layer against moisture and salt.
  • Extends Lifespan: Reducing corrosion slows down structural degradation, increasing the useful life of the barrier.
  1. Safety Enhancement
  • Improved Visibility: Bright, reflective, or contrasting paint improves visibility for drivers, especially at night or in poor weather.
  • Hazard Identification: Colour-coded sections (e.g., yellow/black for danger zones) help alert drivers to sharp turns, merges, or obstacles.
  1. Cost Efficiency
  • Delays Replacement: Repainting is far less expensive than replacing corroded or structurally compromised barriers.
  • Lower Maintenance Costs: Well-maintained barriers require less frequent repairs.
  1. Aesthetic Improvement
  • Neater Appearance: Repainting removes signs of wear, rust, and grime, improving the overall look of roads or industrial areas.
  • Public Perception: Clean, well-maintained infrastructure boosts community trust and reflects positively on the responsible authority (e.g., municipality or business).
  1. Compliance and Regulation
  • Meets Safety Standards: Many jurisdictions have standards for barrier maintenance; repainting ensures compliance.
  • Insurance & Liability: Poorly maintained barriers can be a liability in case of accidents. Repainting helps mitigate risk.
  1. Environmental Benefits
  • Less Waste: Extending the lifespan of existing barriers reduces the need for new steel production and disposal of old materials.

Please contact us for free surveys or if you are looking to enhance the aesthetics and security of your premises.

You can find out more about our recent projects and the work we carry out here.

Lifesaving in Seconds: New Defibrillators Installed Across Fradley Park Estate

Lifesaving in Seconds: New Defibrillators Installed Across Fradley Park Estate

IFM are delighted to share that they have recently installed free-standing defibrillators in key locations throughout Fradley Park near Lichfield, significantly improving access to lifesaving equipment.

A solid, secure base is critical to ensuring that the defibrillator cabinet is stable, visible, and accessible, to anyone who might need it in an emergency. It was vital that these units were installed in the correct location to ensure they faced south to ensure maximum solar charging.

Each unit is registered on The Circuit, the UK’s national defibrillator database, so emergency services can direct 999 callers to the nearest device instantly.

Whether it’s a free standing cabinet or wall mounted unit you are looking for call us for a quote, don’t delay, you never know when you may need this life saving equipment!

You can find out more about our recent projects and the works we carry out here.