Unit Clearance – Osyth, Northampton

Project Overview

This project involved the large-scale removal and clearance of materials, equipment, and redundant stock from a redundant warehouse facility.

Our objective on behalf of the client, was to clear the site while maintaining operational safety standards, minimizing disruption, and ensuring all waste streams were managed responsibly safely and efficiently.

Given our tight deadline, a project schedule was developed to coordinate labour, vehicles, lifting equipment, and waste disposal requirements.

Prior to commencement, a full site assessment was completed to identify:

  • Access and egress routes
  • Manual handling risks
  • Weight and load considerations
  • Hazardous materials or restricted areas
  • Traffic management requirements within the warehouse

Our work included:

  • Removal of obsolete stock and palletised materials
  • Clearance of damaged and non-operational equipment
  • Segregation of recyclable and general waste materials
  • Loading and transportation of waste
  • Final sweep and clean-down of designated warehouse and office areas

Taking care of the environment:

Materials removed from the warehouse were separated where possible to maximise recycling and reduce landfill disposal.

Recyclable metals, wood, cardboard, and plastics were processed through approved waste management facilities.

Project Outcome

The warehouse clearance was completed successfully within the agreed timeframe.

The site was left clean, safe, and ready for its next operational phase.

The project demonstrated effective coordination, safe working practices, and efficient waste management throughout all stages of the removal works.

Through proper planning, experienced personnel, and adherence to health and safety standards, the works were completed with minimal disruption and a high standard of service delivery

 

Handrail Installation – Kineton Primary School

Handrail Installation – Kineton Primary School

Integrity FM recently completed a handrail installation project at a school in Birmingham. Our team was tasked with installing the new handrail system on an existing ramped footpath, improving safety and accessibility for all users.

Sequence of Works

Materials were procured and transported to site, from which our team commenced with the project. A safe working area was established before excavating pockets to either side of the footpath in preparation for receiving the handrail posts.

The traffic yellow handrail was then cut to the required lengths and fabricated on site, with all components assembled to the correct torque to ensure strength and durability. Once assembled, the handrails were carefully positioned and secured, ensuring they were fully vertical and correctly aligned along the ramp.

Following installation, the pockets were backfilled using rapid-set mass concrete, finished slightly below ground level. The surrounding areas were then reinstated with topsoil to maintain a neat and consistent appearance.

Outcome

The finished result is a robust, high-visibility handrail system that enhances safety and accessibility along the ramp. The project was completed efficiently and with minimal disruption, reflecting Integrity FM’s commitment to quality workmanship and client satisfaction.

We’re delighted to have had the opportunity to successfully deliver another high-standard installation and commend our staff on their professionalism and workmanship.

You can find out more about our recent projects and the work we carry out here.

Supply and Install Leak Diversion Kit – LKQ, Tamworth

Supply and Install Leak Diversion Kit – LKQ, Tamworth

This week, our team delivered the successful installation of a leak diversion kit for one of our valued clients at LKQ in Tamworth, ensuring full protection of critical machinery and maintaining uninterrupted operations.

Why Leak Diversion Kits Are a Smart, Effective Solution

Leak diversion kits offer a fast and highly reliable method for managing active leaks—especially in live environments where disruption must be kept to a minimum. Key advantages include:

Minimal Downtime: Systems can be installed swiftly without shutting down critical operations or access routes.

Cost-Effective Protection: Diverts water safely away from assets, equipment, and stock, preventing costly damage or operational impact.

Adaptable to Complex Spaces: Kits can be configured with hoses, bends, and fixings to suit challenging high-level or confined areas.

Temporary or Long-Term Use: Suitable as an immediate short-term measure or as part of a managed leak mitigation strategy.

You can find out more about our recent projects and the work we carry out here.

Paint Spraying of Waste Bins, Cigarette Bins, Wayfinders & Lampposts – McArthur Glen

Paint Spraying of Waste Bins, Cigarette Bins, Wayfinders & Lampposts – McArthur Glen

Our team recently completed an extensive programme of paint spraying at McArthur Glen in Cannock, breathing new life into a wide range of external fixtures across the site.

The project involved the rejuvenation of waste bins, cigarette bins, wayfinding signs and lampposts, all of which had become weathered over time. Each item was carefully restored to achieve a high-quality and durable finish.

How We Delivered the Project

We attended site out of hours and created a safe working area. Dust sheets and masking were applied to safeguard surrounding surfaces, glass and stainless-steel details, preventing any overspray. The surfaces of each item were sanded back to remove previous coatings and imperfections. Certain items were removed for off-site spraying to ensure a controlled application.

Where required, primer was applied before using a professional two-pack paint system, providing a long-lasting, weather-resistant finish. Once cured, protective coverings were removed, items reinstated, and the working areas left clean and tidy before handover.

The Result

The outcome was a uniform, refreshed appearance across the site, significantly enhancing the overall presentation. Disruption to visitors was avoided while ensuring a seamless transformation.

This project highlights how our specialist spraying services can quickly revitalise and extend the lifespan of external fixtures, maintaining a professional and welcoming environment.

You can find out more about our recent projects and the work we carry out here.

Armco Redecoration – Cadent Gas, Erdington

Armco Redecoration – Cadent Gas, Erdington

IFM were tasked with Rejuvenating and Repainting Armco Barriers at Cadent Gas Birmingham.

The barriers were looking tired and aged and in need of a major uplift. Re-painting these has helped improve Health and Safety protection for site users, as well as offering future protection against the elements and therefore saving the client money long term.

This overhaul involved several steps to restore their structural integrity, aesthetic appeal, and corrosion protection.

  1. Corrosion Protection
  • Prevents Rust: Steel barriers are prone to corrosion, especially in wet or coastal environments. A fresh coat of paint acts as a protective layer against moisture and salt.
  • Extends Lifespan: Reducing corrosion slows down structural degradation, increasing the useful life of the barrier.
  1. Safety Enhancement
  • Improved Visibility: Bright, reflective, or contrasting paint improves visibility for drivers, especially at night or in poor weather.
  • Hazard Identification: Colour-coded sections (e.g., yellow/black for danger zones) help alert drivers to sharp turns, merges, or obstacles.
  1. Cost Efficiency
  • Delays Replacement: Repainting is far less expensive than replacing corroded or structurally compromised barriers.
  • Lower Maintenance Costs: Well-maintained barriers require less frequent repairs.
  1. Aesthetic Improvement
  • Neater Appearance: Repainting removes signs of wear, rust, and grime, improving the overall look of roads or industrial areas.
  • Public Perception: Clean, well-maintained infrastructure boosts community trust and reflects positively on the responsible authority (e.g., municipality or business).
  1. Compliance and Regulation
  • Meets Safety Standards: Many jurisdictions have standards for barrier maintenance; repainting ensures compliance.
  • Insurance & Liability: Poorly maintained barriers can be a liability in case of accidents. Repainting helps mitigate risk.
  1. Environmental Benefits
  • Less Waste: Extending the lifespan of existing barriers reduces the need for new steel production and disposal of old materials.

Please contact us for free surveys or if you are looking to enhance the aesthetics and security of your premises.

You can find out more about our recent projects and the work we carry out here.