Refurbishment Works – Birmingham

Refurbishment Works – Birmingham

One of our clients near Birmingham Airport required an extensive refurbishment to their critical to business IT suite. We worked tirelessly with the client to ensure of minimal disruption to business fluidity and implemented a schedule of works to ensure the project was completed within the requested timeframes.

The project involved the deconstruction of existing walls and doors and the disposal of all waste before working from a plan to construct timber studded walls and framework to facilitate the installation of doors. The timber framework was also constructed to facilitate the installation of double-glazed windows. Once the studded framework was in place, soundproof boards were installed within the frame, creating a meeting room which could be used for increased privacy. then supplied and installed fire-rated doors with associated furniture and glazing, as well as new plasterboards, skirtings and the subsequent redecoration of the room.

This provided the IT team with a divided workspace which is bright, fresh and re-energised.

You can find out more about our recent projects and the works we carry out here.

Redecoration Works – Bromford Lane

Redecoration Works – Bromford Lane

Cadent Gas are a Company that is well recognised Nationally with their bright Orange Logos emblazoned across their sites and Company vehicles. In one of their Birmingham Distribution Depots, their office areas and warehouse canteen and were looking tired and in need of an uplift.

The Warehouse is a very busy area with lots of footfall, plant and machinery so our Health and Safety Team planned meticulously to ensure every possible precaution was taken to avoid any issues and to keep the IFM and On-Site Team safe for the duration of the works. To avoid disruption to operations during the week, we carried out the internal decoration over consecutive weekends.

The exterior walls were very porous; therefore, multiple coats were required to the desired covering to give a solid finish, and the internal office walls, skirtings and metal works were all skilfully re-covered, giving the workspaces for the Cadent Team a brighter feel and more pleasant environment.

Please see photos of project and feel free to contact us for any redecoration quotations or requirements.

You can find out more about our recent projects and the works we carry out here.

Extensive Resurfacing Works to Rectify Trip Hazards – Fradley Park

Extensive Resurfacing Works to Rectify Trip Hazards – Fradley Park

The importance of maintaining footpaths in order to minimise trip hazards is vital in preventing injury to employees and the general public. At one of our Client’s sites, some of the footpath had deteriorated, presenting a danger to passersby. The defective section of footpath was cut out and excavated, with a new tarmac surface vibrocompacted and relayed after. The repair works were completed with an overbanding to protect from any water ingress and weather elements.

Our repair reduced the risk of trip hazards causing harm on site due to tarmac dilapidation.

You can find out more about our recent projects and the works we carry out here.

Partition Works – Birmingham Ormiston Academy

Partition Works – Birmingham Ormiston Academy

Birmingham Ormiston Academy is a regional academy for digital, creative and performing arts located in the centre of Birmingham, West Midlands.

Last month, Integrity were tasked with installing a boarded and redecorated partition to alter the building layout and provide additional separated space for the Students.

Working closely with the onsite building team, we ensured that timelines were met, and works were carried out with minimal disruption.

The partition consisted of a timber studwork partition which was subsequently boarded, filled and redecorated to the highest standard.

A new timber Fire Door and Frame with a vision panel were installed, in keeping with the current colour scheme and door type inclusive of matching ironmongery.

The client feedback on the end results was excellent.

You can find out more about our recent projects and the works we carry out here.

Floor Repairs & Replacement Vinyl – Cadent, Birmingham

Floor Repairs & Replacement Vinyl – Cadent, Birmingham

Cadent Gas, the leading gas supplier for the country, relies heavily on supported buildings to ensure they function at 100%. At one of their sites in the Midlands, a floor had depreciated in structural integrity. IFM carried out a complete strip out of the overlay, timber boards and structural timber supports. The supports were reinforced, the timber was replaced for new and a new overlay, welded non-slip flooring system was installed.

You can find out more about our recent projects and the works we carry out here.