Bollard Painting

Bollard Painting

Due to dilapidation and weathering, a large number of bollards needed to be sanded and repainted. The bollards on site were used to inform drivers of potential traffic hazards and obstructions therefore they played a vital role in traffic management on this site in Dudley.

Once all old surplus paint had been removed the surface was prepared to receive new all-weather paint. Integrity used a one coat special product to ensure that the bollards were brought back in line with their original standard aesthetically leaving the client happy.

Project Details

Location: Dudley

Thermoplastic Car Park Numbering

Thermoplastic Car Park Numbering

Integrity were tasked with numbering 437 car park spaces in a thermos-plastic membrane at one of our clients newly operating  sites in Birmingham. Following a site survey, a  sequence of numbers, size of font and paint colour was agreed with the clients requirements.

Our Engineers began by removing all loose stones and chippings in preparation to enable for the surface to receive the paint. Once free from debris, all designated parking spaces which were pre marked had the numbers applied leaving the Car Park organised and ready for its end user.

Project Details

Location: Birmingham

Bespoke Barrier Installation

Bespoke Barrier Installation

Following lots of historical problems with travellers trying to gain access to site, Integrity was tasked with trying to find a solution. A bespoke double leaf barrier was installed to the entrance of the site which included a padlock and cover and back posts to secure the barrier when open.

On the first visit the posts to the main gate were installed into deep concrete foundations and concreted in. We then returned once the concrete had set to attach the leaves along with the back posts this left the site manager safe knowing that the main car park to his company is safe and secure. Another job professionally done by Integrity FM.

Rubbish Removal and Roof Repair

Rubbish Removal and Roof Repair

Our engineers have been working tirelessly conducting a rubbish removal and roof repair in Coventry which has been leaking through the roof into the store below causing an inconvenience to the client.

After removing a large amount of rubbish, debris and vegetation from the roof area, our engineers began repairing the areas of the roof that were damaged and were leaking through into the store below.

Following the repairs to the roof our engineers also secured the roof by putting new locks onto the door of entry and barbed wire around the door in order to stop any unwanted trespassers gaining access to the area before handing over to yet another satisfied client.

Project Details

Location: Coventry

Shop Window Replacement

Shop Window Replacement

Last week, Integrity were called out to conduct a window replacement for a broken window at a busy clothing store in Birmingham City Centre.

Upon arrival our engineers quickly began removing the broken pane from the window. Then, our engineers set out installing the new piece of glass before adding the vinyl lettering to the window before handing over to a very satisfied client.

Project Details

Location: Birmingham City Centre