Replacement of Damaged Aco Channels – The Fort Shopping Centre

Replacement of Damaged Aco Channels – The Fort Shopping Centre

Integrity Facilities Management were engaged by The Fort Shopping Centre to break out, uplift and replace a large section of drainage channels to their main carpark. These works involved…

  • Straddle cutting each side of the channels
  • Breaking out the tarmac and concrete substrate
  • Removal of defective run of channels.

Once all waste and debris were disposed of, we supplied and installed heavy-duty channels which have the capability to cope with extremely heavy vehicle loads. Included in the run was a channel sump unit, which had to be removed and replaced, ensuring alignment with the low-level drain. Once the channels were installed to the appropriate levels, we backfilled each side with high-strength concrete and applied a neat finish to complete the work. 

Supply and Installation of Glass – Amazon UK

Supply and Installation of Glass – Amazon UK

Integrity have established themselves as a regular service provider for Amazon at their premises in Coventry. The nature of Amazon’s business means that the site is in use and extremely busy 24 hours a day, 7 days a week.

An integral part of the functionality of site is the reception areas in which drivers visit before they collect and drop off goods. The constant flow of traffic in this area meant that communication had to be at its optimal to enable full fluidity.

In order for the reception staff and drivers to communicate easily and freely a proposal was made to supply and install a bespoke piece of glass to replace what was currently there. A measured piece was manufactured to enable delivery notes to be passed freely underneath and for all communications to be heard clearly, enabling for a faster process.

Project Details

Client: Amazon UK
Location: Coventry

Balcony Repairs – Birmingham, The Cube

Balcony Repairs – Birmingham, The Cube

A tenant at one of the most prestigious residential/commercial property locations in Birmingham had been suffering the long term effects following an endless flow of leaks into their property from the balcony above. Integrity Facilities Management were put forward to the property manager by an existing client and tasked to provide a quick and effective balcony repairs to rectify a significant property renovation issue which other contractors failed to tackle.

IFM surveyed and began proposing the optimal and most cost-effective solution. The large granite blocks and insulation were uplifted and removed for re-use. A drying off process was actioned to ensure the integrity of the roofing felt and boarding. Our operatives could then begin with levelling out the surface area to ensure that future rainfall would direct itself into the included drainage. As a main protector to the surface, we then applied our specialist roofing system.

After leaving the site to allow the material time to cure the Engineer’s re-laid the roofing felt and carefully positioned the slab supports before re-laying the slabs and levelling to ensure of no trip hazards and general safety.

Yet again, Integrity delivered an optimal, cost-effective property renovation solution under a restrictive and pressurised time scale. The client and tenant were extremely happy with the work we carried out stating that the job was “very professional and excellent quality” as well as adding “the operatives were very approachable and helpful”.

Since the work, Integrity Facilities Management has been invited to survey and quote for more troublesome leaks involving the balcony area’s and are used regularly to carry out other projects on behalf of the client.

Supply and Installation of Bespoke Security Double A-Frame Barrier – IBM

Supply and Installation of Bespoke Security Double A-Frame Barrier – IBM

Our client was experiencing major issues with trespassers gaining access to a site in Warwickshire.

IFM were tasked with a rapid turnaround to source a mode of security to keep the unwanted visitors out and had measures in place within 5 hours. Temporary, retractable bollards were installed whilst a long term solution was planned out.

We worked closely with the FM and Engineering Team to design, advise and recommended something that would provide full proof future security. A bespoke design was chosen which included a hinge opening top frame with back post and additional centre frame.

This particular design would allow access for certain height vehicles only during working hours whist keeping other more taller vehicles out. Inclusive and not trending with the norm, an additional centre frame and hinge was added to provide a 24 hour barrier and both would be lockable with a heavy duty deterrent lock.

Block paviours were carefully uplifted to accommodate the dig and let to one side for replacement following installation. A deep excavation was required given the size and weight of the frame and posts. Once they were dug to the required depth, the posts were positioned and a fast curing concrete mix was ‘back-filled’ to keep them upright and secured in place.

A curing time for the concrete was required before our team of Engineer’s could re-attend site to install the double A-Frame gate and back post before re-instating the block paving around the posts. Following the complete installation of the barrier an additional coat of high quality paint was applied to give an excellent final finish.

Here’s what our client had to say about the work “I have found that Integrity provide an excellent service. The standard of work has been first class, another job well done”.

We are proud to have delivered another cost-effective solution that will keep the site secure from trespassers and keep the site functioning without any unwanted distractions.

Project Details

Location: Warwickshire

Supply and Installation of Uniquely Fabricated Knee Rails – Retail Park, Staffordshire

Supply and Installation of Uniquely Fabricated Knee Rails – Retail Park, Staffordshire

Known as a knee rail due to its height many commercial properties look to these installations to protect their boundaries and to stop the public waking or driving where they shouldn’t. Historically installed wooden knee rails at one of our clients sites in Staffordshire began to perish. This can be caused by; weathering, vegetation growth and movement due to the public resting/standing on them. A site survey was carried out by Integrity to propose and agree on a sufficient and durable replacement for the perimeter.

Due to its weatherable properties and strength it was agreed that a stainless steel galvanised trip rail was the best option. Integrity worked closely with its suppliers to manufacture a bespoke fabrication which was finished in a powder coated black. This was a large scale installation carried out with high efficiency to ensure that security of site was upheld whilst still being ascetically pleasing.

Project Details

Location: Staffordshire