Vital Maintenance Work in Sterile Room Environment

Vital Maintenance Work in Sterile Room Environment

Integrity engineers recently carried out vital maintenance work in a Sterile Room at one of our client’s medical sites in Birmingham. Our engineers proving that they can work to their usual high standards despite working in a highly pressurised environment.

In order to comply with the regulations, new specialist tools were purchased in order for us to carry out works. Our operatives wore special clean – room clothing in order to protect the products in the surrounding work area. The specially designed clothing provided head-to-toe cover with minimal chance of warm air aspirates reaching the room or products ensuring that the products stored in the area would not be contaminated.

Having dawned his protective equipment, our engineer set about completing the vital maintenance work. Integrity meticulously sealed open joints which were detrimental to the products stored in the vicinity to the openings. Using a specialist high grade sanitary silicone.

Lastly, we made vital repairs to the equipment within the clean room. The Engineers carefully removed the defective screw end caps and ensuring of their safe disposal before installing new high grade caps which meet the requirements of the room.

At Integrity, the client is always at the centre of our service. We take immense pride in receiving great feedback as part of our satisfactory process with the client. The comment below is what was  left by our client once these works were completed.

“Excellent Level of Service as usual! All requested repairs we’re carried out”

Experience is vital when commencing works such as this.

Please contact us should you require any quotations for works in this kind of environment.

Project Details

Client: NHS
Location: Birmingham

Palisade Fence Installation

Palisade Fence Installation

One of our clients retail sites were experiencing constant problems with trespassers. Integrity submitted an excellent, cost-effective solution to carry out a Palisade Fence installation to help prevent further issues. Our Engineers showed real determination in adverse weather conditions to ensure of completion within deadline to another happy client.

For more information on our fencing installations please contact fm@integrityfm-uk.com

Project Details

Location: Black Country

NHS Black Country – Hip Roof Repairs

NHS Black Country – Hip Roof Repairs

Integrity submitted a competitive quotation to remove and replace damaged roof tiles at one of our NHS sites in the Black Country.

The job required the use of high level access equipment was used by one of our trained Engineers. Once we accessed the roof safely, all damaged ridges and debris were removed as well as affected surrounding pantiles. The areas were prepared to receive the new tile and ridge material which were then secured in place using a composite for an excellent aesthetic finish.

Project Details

Client: NHS
Location:
Black Country

Sign Removal and Cladding Repair

Sign Removal and Cladding Repair

Last Friday, our engineers battled against the adverse weather conditions and were successful in conducting a sign removal and cladding repair for one of our clients logistical warehouses in the West Midlands.

Upon arriving to site we set up a safe working area and erected our access equipment. Our engineer began deconstructing the large sign for removal. Once the sign had been removed we completed repairs to make good the aesthetics of the cladding before handing over to another satisfied client.

Project Details

Location: West Midlands

Replacement of 3 Water Pumps

Replacement of 3 Water Pumps

Integrity’s Engineers were recently tasked at one of our clients sites in Birmingham City Centre.

After being successful in the quotation process, Integrity were tasked with replacing three specialised water pumps.

Our engineers began decommissioning pumps ready for the new installations disposal. Once the old pumps had been removed our engineers began modifying the pipework before fitting the three new pumps and re-commissioning the system leaving all of the pumps operational before handing over to another happy client.

Project Details

Location: Birmingham City Centre