Pothole Repairs – Waitrose, Hall Green

Pothole Repairs – Waitrose, Hall Green

Over time, the surface area in the carpark had degraded, leaving multiple areas with potholes. This common problem was an obvious health and safety issue which needed rectifying to avoid any accidents and vehicular damage. Some of the work had to be completed outside of store opening times and the rest was completed with traffic/pedestrian management in place to avoid disruption to the store’s core business.

Installation of Letterboxes – Walsall

Installation of Letterboxes – Walsall

The old freestanding timber letterboxes, at a property managed by our client, were not only aged but also taking up unnecessary floor space. Integrity cut out sections behind the plasterboard wall and studded out so that a secure and strong fixing could be achieved. Once this was constructed, the plasterboard was reinstated, filled and the wall painted. We then returned to site and fixed these aesthetically pleasing letterboxes to the wall. The entrance area now has more floor space as well as cleaner and tidier letterboxes for the occupant’s use.

Installation of Bund Wall – HTRC Coventry

Installation of Bund Wall – HTRC Coventry

Our client, CBRE, had previously experienced issues with spillages formulating from ductwork and spreading across the plant room floor. To avoid repeat occurrences, we constructed a fully tanked and waterproof bund wall. This consisted of preparing a composite bed to the surface area, supplying and laying blockwork to the composite bed, allowing time for the composite to fully dry. We then returned to site and applied waterproof tanking inside of the blockwork to absorb any future liquid outpours.

Gutter Re-lining – Wieland Metals

Gutter Re-lining – Wieland Metals

Roof Leaks into industrial production warehouses can be the cause of serious issues and disruption to core business as well as damage to assets critical to manufacturing functionality. 100m of guttering on this site was in need of cleaning to free up the flow of rainwater. Once all gutters were clear, the whole runs required future proofing against any inclement weather. We used a specialist roofing system on these gutters which had excellent adhesion to the bituminous surface. Primer was applied to the standing surface and then a base layer and fleece, which was then top coated with sealant applied to any hard-to-reach areas. Once coated, the compound forms a seamless elastic membrane without any joints. This allows it to be airtight and waterproof, thanks to its versatility.

Fire Escape Opening – Cadent, Ansty Park

Fire Escape Opening – Cadent, Ansty Park

To ensure compliance following a fire risk assessment, an opening to an external cladded wall on the roof area in Ansty was required for implementation. Using specialist cutting equipment, a section was cut out of the cladding on both sides as well as the core of the wall. A frame was specially constructed out of replacement cladding and steps were built to allow free and easy access from one area of the roof to another.